CONTROL SYSTEM REVIEW

UPS Automated Air Facility contracted our Design Engineers due to their expertise. They were asked to review electrical and controls drawings created by a third party. UPS wanted to ensure the legitimacy of these drawings, consulting with our team. There were several aspects that we were required to review.



Some of the Features Included in this Project:

  • Ensured cost-effectiveness of the project

REVIEWED CRITERIA

There were several specific points that our engineers reviewed. One of the major points was checking the integrity of the single line power distribution architecture. It was compared against the mechanical motor manifest listing. This verified several different power capacities. They also calculated the voltage drop on each circuit and were able to recommend oversize wire gauges per necessary location. Lastly, the review involved checking for accuracy, engineering best practices, as well as taking into account the total cost effectiveness of field installation and ownership.